Experiments

New experiment
Experiments
6
since Aug 12
Graded runs
41
6,150 fields
Eval spend
$75.18
$1.83 per run
Reached a verdict
4 of 6
2 still inconclusive
Median runs to verdict
5
12 needed to separate

Accuracy with confidence intervals

each bar is one bundle · whiskers are the 95% interval
baseline band85%90%95%100%0.9.292.4%n 5baseline0.10.093.1%n 5inconclusive0.10.188.9%n 5discard0.11.093.8%n 5inconclusive0.12.096.4%n 12keep
shaded band is the baseline intervalseparates aboveseparates belowoverlaps baseline

This replaces a trend line on purpose. With five runs the interval is roughly ±2 points, so 0.10.0 and 0.11.0 sit inside the baseline band and mean nothing — a line chart would have drawn them as progress. Only 0.12.0 clears the band, and it needed 12 runs to get there.

Graded against sampled

the lab number is consistently optimistic
88%90%92%94%96%98%0.9.292.490.8−1.6 pt0.10.093.191.4−1.7 pt0.11.093.892.6−1.2 pt0.12.096.495.1−1.3 pt
graded, against ground truthsampled, from blind production review

The gap runs 1.2 to 1.7 points and hasn’t closed. Live files are messier than the corpus, so a graded gain should be discounted before anyone promises it to a stakeholder. If this gap ever widened sharply it would mean the corpus had drifted away from production.

All experiments

append-only
Every graded experiment, newest first
bundlehypothesisaccuracyrunscostseparatesverdict
0.12.0step-7 title review; checker sees obligation lines96.4% ±1.212$26.28yes, abovekeep
0.11.1same, first build—2$3.10—crash
0.11.0Opus 4.8 to Opus 5, reasoning effort xhigh93.8% ±1.95$10.60no, overlapsinconclusive
0.10.1drop page citations from document-reader88.9% ±2.45$11.40yes, belowdiscard
0.10.0split step-4 into obligations and qualifying payment93.1% ±2.15$11.55no, overlapsinconclusive
0.9.2HELOC File Review v1, Opus 4.892.4% ±2.05$12.25—baseline

Field failures across bundles

out of 150 fields per run
Field failure counts by bundle
field0.9.20.10.00.11.00.12.0Δreading
DebtToIncomeRatio8761-7fixed by giving the checker obligation lines
InvestmentAccounts3333—flat — a missing-document problem, not reasoning
HousingHistory2210-2resolved incidentally
FloodZone1111—single ambiguous parcel in the corpus

InvestmentAccounts hasn’t moved across four bundles because no bundle change can fix it — the statement isn’t in the folder. That row is an intake problem wearing an accuracy costume, and it’s the clearest case for spending the next attempt somewhere else.

Run one

Estimated $26.28. At 12 runs the interval lands near ±1.2 and can separate from baseline.

What this doesn’t tell you

Every accuracy figure on this page is graded against a labelled corpus, which means it is a lab measurement and optimistic by the 1.2 to 1.7 points the gap chart shows. None of it is evidence about production; that only comes from blind review.

Four of the six bundles rest on five runs, which buys an interval near ±2 — wide enough that a real two-point improvement would still read inconclusive. Reading those rows as “no effect” is as wrong as reading them as progress. They mean the experiment was too small to say.